Buy now

How to Bid on FDOT Contracts: Prequalification, Bid Express, MFMP Registration, Forms (2026)

See the nine standard Florida bid forms filled in free from your company profile. Bid Forms Kit $79 for 12 months, one payment.

Fill my bid forms free

Short answer: the Florida Department of Transportation (FDOT) buys on two tracks. Road and bridge construction is let through bid solicitation notices and bid only on Bid Express; any construction bid over $250,000 needs FDOT prequalification first (s. 337.14). Commodities and services go through the state's MyFloridaMarketPlace (MFMP): register there and watch the Vendor Bid System. Small firms can bid FDOT's small business projects, which can skip prequalification. Read November 23, 2026 on FDOT's and MFMP's own pages and the Florida Statutes.

Got an FDOT solicitation? Run the free Bid Check

1. Construction lettings

  • FDOT's Contracts Administration Office “advertises and awards federally funded road and bridge construction contracts”; the district contracts offices let other construction and maintenance work.
  • Projects open for bids are listed in the Bid Solicitation Notice for each letting; the letting project information page has the 2026 lettings (the next Central Office letting is December 2, 2026). Plans are on FDOT's contract plans site.
  • How you submit: “bids for all projects must be submitted using Bid Express only.” “No other means of submission of bids will be accepted.” Bid Express (bidx.com) uses the AASHTOWare Project Bids software.

2. Prequalification

Section 337.14(1), Florida Statutes: “Any contractor desiring to bid for the performance of any construction contract in excess of $250,000” must first be certified by FDOT as qualified. You apply online in FDOT's contractor prequalification system; FDOT asks for an MFMP vendor number and an active Sunbiz registration, and some work classes need extra forms. The 2026-27 Standard Specifications (2-1) add that “the Department may waive prequalification requirements on contracts of $500,000 or less,” so read each notice.

3. Small business projects

FDOT's Business Development Initiative (section 337.027, Florida Statutes) defines a small business as one with average gross receipts of “less than $25 million for road and bridge contracts” and lets FDOT set contracts aside and waive bond requirements. FDOT publishes its designated small business contracts. Example: in the December 2, 2026 letting, project T5896 (SR 436 at University Blvd, Orange County; estimate $1,382,186) says “Prequalification per Rule 14-22 is not required,” asks for a Small Business Affidavit (Form 275-000-01) and a BDI Reference Sheet (Form 275-000-02), and sets a proposal guaranty of $500.

4. Proposal guaranty (bid bond)

Section 337.17: FDOT “shall only require guaranty with each bid for a construction contract in excess of $150,000,” in an amount it specifies that “shall not exceed 10 percent of the preliminary estimate,” and the bidder chooses the form: cashier's check, bank money order, bank draft, certified check or surety bond, payable to the department. The December 2, 2026 notice sets it: “For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required,” on a bond that substantially conforms to Form 375-020-09. The winning bidder then gives a contract bond equal to the contract amount (Form 375-020-27). See bid bonds in Florida, with a free bid security calculator.

5. Commodities and services: MyFloridaMarketPlace

“Formal procurement of commodities and contractual services are advertised in the Vendor Bid System.” To bid, register as a vendor in MFMP and sign up for bid notices in its Vendor Information Portal (VIP), as FDOT's vendor quick links explain. The state's MFMP transaction fee is 0.7% of payments from July 1, 2026 through June 30, 2027; FDOT's Doing Business page says procurements under section 337.11 (construction) are not subject to the fee. Step by step: MyFloridaMarketPlace vendor registration.

6. DBE program

FDOT's DBE certification page says FDOT has removed “any presumption of social and economic disadvantage based solely on race or gender” and that firms certified before October 3, 2025 must file reevaluation papers “prior to December 11, 2026.” Letting bids still carry DBE paperwork (below).

7. Contact rules

Construction notices say no action will follow from “any oral discussion with a State employee” and send questions only through FDOT's bid question system. For commodities and services, section 287.057(25) has each solicitation say that respondents may not contact any employee or officer of the executive or legislative branch about it from its release until 72 hours (excluding weekends and state holidays) after the agency posts the notice of intended award, except in writing to the procurement officer or as the solicitation provides.

8. Forms an FDOT letting asks for

  • Bid bond, Form 375-020-09 (or another guaranty the notice allows).
  • Certification of Work Underway, Form 375-020-39 (prequalified bidders).
  • Joint venture paperwork, if bidding as a joint venture (Standard Specifications, section 2).
  • The non-collusion statement, which internet bidders acknowledge in the proposal in Bid Express (Standard Specifications 2-5), and the debarment and suspension certification in the notice.
  • DBE items (Standard Specifications 7-24): an approved DBE Affirmative Action Program Plan on file with FDOT's Equal Opportunity Office before award, and DBE commitments at or before the preconstruction conference.
  • Small business projects: Forms 275-000-01 and 275-000-02.

Bidding a county, city or state agency job as well? FDOT lettings use FDOT's own forms in Bid Express. For the standard affidavits most other Florida public bids ask for, ReadyBid Pack fills in nine standard Florida bid forms from one company profile; the preview is free, and the Bid Forms Kit to download them is $79 for 12 months. Always use an agency's own form wherever it provides one.

Fill my bid forms free

Related: how to bid in Florida, by agency · non-collusion affidavit · payment and performance bonds.

Sources

Last reviewed November 23, 2026 against FDOT and MFMP pages, the December 2, 2026 letting notice and the 2026 Florida Statutes. ReadyBid Pack is independent and not affiliated with the Florida Department of Transportation or MyFloridaMarketPlace. We prepare bid documents and are not a law firm or a government agency. Always follow the solicitation you are bidding on.

5 min read

ReadyBid Pack
Florida public bids, ready to submit: requirements found, forms filled, nothing missed. See pricing

Also from our guides

From $79One payment · 12 months · 30-day refund
Buy now